Last item for navigation
NOTICE OF APPLICATION (NOA) and DETERMINATION OF NON-SIGNIFICANCE (ODNS) 7/11 Fuel Tank Removal SEP23-0006 & GRA23-0005

NOTICE OF APPLICATION (NOA) and
DETERMINATION OF NON-SIGNIFICANCE (ODNS) 
7/11 Fuel Tank Removal 
SEP23-0006 & GRA23-0005 

The City of Auburn is issuing a Notice of Application (NOA) and a Determination of Non-Significance (ODNS), using the optional process, for the following described project. The permit applications and listed studies may be reviewed at the Auburn Department of Community Development at One E Main St., 2nd Floor, Customer Service Center, Auburn, WA 98001 and by visiting www.auburnwa.gov/landuse.

Proposal: Demolition and removal of the existing fuel station supporting infrastructure including three 12,000-gallon petrol storage tanks, underground and aboveground product, vent, and vapor piping, oil/water separator, monitoring equipment. Removal of fuel dispensers, bollards, and concrete drive and tank slabs. Demolish one 625 square foot steel fuel system canopy. Backfill and restoration of the site with asphalt to match existing parking lot. Maintain existing surface topography, slopes and storm drainage system. The existing 7/11 store will remain unchanged. 

Location: The project site is a single parcel (no. 192105-9078), northwest of the intersection of R St. SE and Howard Rd. SE., within the quarter-section-township-range SE-10-21-05. 

Notice of Application: 
July 12, 2024
Application Complete: 
February 14, 2023
Permit Application: 
January 17, 2023 

File Nos. 
SEP23-0006 & GRA23-0005 

Property Owner: 
7-ELEVEN 
13155 Noel Rd., 100 LB73 
Dallas TX, 75240 

Applicant’s Representative: 
Stantec Consulting Services 
Paul Fairbairn 
1687 114th Ave. SE Suite 100 
Bellevue WA, 98004 

Applicant: 
Stantec Consulting Services 
Paul Fairbairn 
1687 114th Ave. SE Suite 100 
Bellevue WA, 98004 

Studies/Plans Submitted With Application (PDFs): 

  • SEPA Environmental Checklist, prepared by Barghausen Consulting Engineers, revision dated September 2023 
  • Preliminary Civil Plans, prepared by Stantec Consulting Services., revision dated November 2023 Stormwater
  • Pollution Prevention Plan, prepared by Stantec Consulting Services., revision dated March 2024 (AVAILABLE UPON REQUEST)

Other Permits, Plans, and Approvals Needed: 
Grading Permit (GRA23-0005)

Statement of Consistency and List of Applicable Development Regulations: This proposal is subject to and shall be consistent with the Auburn City Code, Comprehensive Plan, and Public Works Design and Construction Standards. 

Lead Agency: City of Auburn. The lead agency for this proposal has determined that it does not have probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. 

SEPA Environmental Review: The optional DNS process in WAC 197-11-355 is being used. The lead agency will not act on this proposal for 15 days from the date issued below. The City of Auburn has reviewed the proposed project for probable adverse environmental impacts and expects to issue a determination of non-significance (DNS) for this project. 

Public Comment Period: This may be your only opportunity to comment on the environmental impact of the proposal. All persons may comment on this application. Comments must be in writing and submitted by 5:00 PM on July 26, 2024 to the mailing address of 25 W Main St., Auburn, WA, 98001 or emailed to the contact below. Any person wishing to become a party of record, shall include in their comments that they wish to receive notice of and participate in any hearings, if relevant, and request a copy of decisions once made. The responsible official will reconsider the DNS based on timely comments and may retain, modify, or, if significant adverse impacts are likely, withdraw the DNS. If the DNS is retained, it will be final after the expiration of the comment deadline. 

Any person aggrieved of the City's determination may file an appeal with the Auburn City Clerk at 25 West Main St., Auburn, WA 98001-4998 within 14 days of the close of the comment period, or by 5:00 PM on August 9, 2024. 

For questions regarding this project, please contact Gabriel Clark, Planner, at planning@auburnwa.gov or 253-470-24147. 

Public Hearing: N/A  

Vicinity Map

 

Site Plan

Site Plan