Search
Last item for navigation
7-ELEVEN FUEL SYSTEM REMOVAL

NOTICE OF APPLICATION (NOA) and
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS)
7-ELEVEN FUEL SYSTEM REMOVAL
SEP22-0005


The City of Auburn is issuing a Notice of Application (NOA) and Optional Determination of Non-Significance (DNS) for the following described project. 

Proposal: Remove three underground 12,000-gallon fuel storage tanks, vent and vapor piping, monitoring equipment, dispensers, bollards, and concrete drive and tank slabs. The existing fuel system canopy, approximately 625 square feet in size, is proposed to be demolished. The existing 7-Eleven convenience store will remain. The canopy and tank removal area to be backfilled and restored with asphalt to match existing parking lot grade.

Location: The project is located at the intersection of Auburn Way N and 22nd St NE, on the east side of Auburn Way S and to the north of 22nd St . King County Assessor Parcel No. 5125400150.

Notice of Application:
April 8, 2022
Application Complete: 
April 1, 2022 
Permit Application:
March 14, 2022

File No. 
SEP22-0005

Property Owner:
7-Eleven
3200 Hackberry Road
Suite 100 LB73
Irving, TX 75240

Applicant’s Representative:
Stantec Consulting Services, Inc
1687 114th Ave SE, 100
Bellevue, WA 98004

Applicant:
Paul Fairbairn
Stantec Consulting Services, Inc
1687 114th Ave SE, 100
Bellevue, WA 98004

Studies/Plans Submitted With Application:
None

Other Permits, Plans, and Approvals Needed:
Grading Permit 
Fire Permit 
Demolition Permit
30-Day UST Removal Notification – WA Department of Ecology. 

Statement of Consistency and List of Applicable Development Regulations:  This proposal is subject to and shall be consistent with the Auburn City Code, Comprehensive Plan, and Public Works Design and Construction Standards.

Lead Agency: City of Auburn

The lead agency for this proposal has determined that it does not have probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. 

Public Comment Period: This may be your only opportunity to comment on the environmental impact of the proposal. All persons may comment on this application. This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date issued below. Comments must be in writing and submitted by 5:00 PM on April 23, 2022 to the mailing address of 25 W Main St., Auburn, WA, 98001 or emailed to the contact below. Any person wishing to become a party of record, shall include in their comments that they wish to receive notice of and participate in any hearings, if relevant, and request a copy of decisions once made.

Any person aggrieved of the City's determination may file an appeal with the Auburn City Clerk at 25 West Main Street, Auburn, WA 98001- 4998 within 14 days of the close of the comment period, or by 5:00 p.m. on May 7, 2022.

For questions regarding this project, please contact Nicole Benert, Planner, at [email protected] or 253-470-2147. 

Public Hearing:
N/A

Vicinity Map

vicinity map

Project Site

project site